“双碳”背景下,光伏装机容量持续增加但建设用地却不断减少,促使渔光互补等复合型光伏发电项目在“十四五”期间成为开发建设的热点。如何合理评估渔光互补光伏发电项目的技术经济特性,为项目开发建设提供决策依据有待进一步研究。以广东省某150 MWp渔光互补集中式光伏发电项目为研究对象,通过优化容配比、组件倾角及阵列间距等边界条件制定最佳建设方案。以此为基础,利用通用LCOE模型测算项目平准化度电成本,分析发电量、单位造价、贷款利率、运维成本等不确定性因素对项目LCOE的影响程度,考察该项目的可行性。经评估,该项目技术可行、经济合理、风险可控,具备一定开发价值。
Abstract:Under the background of “carbon peaking and carbon neutrality”,the installed capacity of PV power system continues to increase but the construction area decreases correspondingly so that fishery-PV complementary power generation project becomes a hot spot of investment during the period of “14th five-year plan”.It’s required to further study how to evaluate the technical and economic characteristics of fishery-PV complementary power generation project so as to provide a support for decision making when this kind of project is developed.A 150 MWp fishery-PV complementary power generation project was investigated as research object.The capacity ratio,tilting angle and array spacing as boundary condition were optimized to find an optimum scheme.Based on this optimum scheme,the levelized cost of electricity (LCOE) was calculated with a generic model.Moreover,these uncertainty factors including annual electricity output,cost per kilowatt,loan interest rate and operational & maintenance cost were analyzed to figure out their influences on LCOE so as to investigate the feasibility of this project.It has been proven that this project is valuable to be developed based on its technical feasibility,economic reasonability and risk controllability.
[1]国家发展改革委,国家能源局,财政部.“十四五”可再生能源发展规划[Z].2021.
[2]广东省人民政府办公厅.广东省能源发展“十四五”规划[Z].2022.
[3]甘凯元.广西某渔光互补光伏发电项目经济评价[J].广西水利水电,2022(3):111-114.
[4]陈荣荣,孙韵琳,陈思铭,等.并网光伏发电项目的LCOE分析[J].可再生能源,2015,33(5):731-735.
[5]刘江,胡萍.光伏发电项目LCOE模型的应用分析[J].水电与新能源,2022(8):19-22.
[6]昌敦虎,田川,张泽阳,等.基于LCOE模型的光伏发电经济效益分析:以宜昌农村地区光伏扶贫电站项目为例[J].环境科学研究,2020,33(10):2412-2420.
[7]张健,王宾.关于光伏电站建设中组件与逆变器容配比最优方案的浅析[J].四川水利,2019(4):33-35.
[8]裴骏,陆炜,田介花,等.双面光伏组件在多类型光伏电站中的发电特性研究[J].太阳能,2020(2):37-44.
[9]ROBERT H.BUSHNELL.A Solution for Sunrise and Sunset Hour Angles on a Titled Surface Without a Singularity at Zero Azimuth[J].Solar Energy,1982,28(4):357.
[10]中国电力科学研究院有限公司.光伏发电效率技术规范:GB/T 39857—2021[S].北京:中国电力企业联合会,2021.
[11]国家能源局南方监管局.南方区域电力并网运行管理实施细则[Z].2022.
[12]国家能源局南方监管局.南方区域电力辅助服务管理实施细则[Z].2022.
基本信息:
DOI:10.13500/j.dlkcsj.issn1671-9913.2024.11.004
中图分类号:TM615
引用信息:
[1]周晓彬.广东省某渔光互补光伏发电项目技术经济评价[J].电力勘测设计,2024,No.200(11):16-22+27.DOI:10.13500/j.dlkcsj.issn1671-9913.2024.11.004.